The best plant is the one that matches your influentโdesign starts with sampling and realistic operating data.
Key points
- Characterize influent: pH, COD/BOD, TSS, oil & grease, heavy metals (if applicable).
- Plan equalization for peak loads and shock events.
- Select biological process (MBBR/SBR/ASP) with sludge handling.
- Add tertiary steps when reuse is planned (filtration, carbon, disinfection).
- Define O&M: chemicals, energy, manpower, spares, and monitoring frequency.
We recommend starting with a pilot or at least a robust jar-test and treatability assessment.